Mellotron MK VI Development, page II.

 

to page III.

Trksel2.jpg (80280 bytes) Closeup of the new track selector mechanism.
 

Completed main frame.

Mainfr1.jpg (78452 bytes)
Mainfr2.jpg (86840 bytes)  

 

Another look inside. All of the Mk VI construction

was done with numerically controlled machining,

perhaps the most benefit going to the precision of

the mainframe and the cutting of the spill box

divider slots. accurate to .0002

New keyboard assembly.

Newkbd1.jpg (84116 bytes)
Newstuff.jpg (78000 bytes) Pile-O-Tron parts.
 

New stainless pad springs.

Padspr1.jpg (80284 bytes)

to page III